Electrolux EHG674 User Manual

G a s H o b  
INSTRUCTIO N BO O KLET  
Models EHG 672 - EHG 674 - EHG 675  
GB  
35670-2601  
Con t en t s  
For the Installer  
For the User  
Tech n ical Dat a  
Page 1 2  
Descript ion  
of t h e Hob  
Page 5  
Page 6  
Im port an t Safet y  
Requ irem en t s  
Page 1 3  
Page 1 4  
Page 1 4  
Page 1 5  
Operat ion  
In st allat ion  
Main t en an ce  
an d Clean in g  
Page 7  
Page 8  
Page 8  
Gas Con n ect ion  
Bu ildin g In  
Som et h in g Not  
Work in g?  
Elect rical Con n ect ion Page 1 6  
Service an d  
Spare Part s  
Wirin g Diagram  
Fau lt Fin din g  
Com m ission in g  
Servicin g  
Page 1 7  
Page 1 8  
Page 2 0  
Page 2 1  
Gu aran t ee Con dit ion s Page 9  
Elect rolu x Service Force  
Cen t re Addresses  
Page 1 0  
Con version from  
n at u ral gas t o LPG  
Page 2 1  
Guide to Use the instructions  
The following symbols will be found in the text to  
guide you throughout the Instructions:  
Safety Instructions  
This appliance is manufactured according  
to the following EEC directives:  
73/23 EEC - 90/683 EEC - 93/68 EEC -  
89/336 EEC - 90/396 EEC,  
Step by step instructions for an  
operation  
current edition.  
Hints and Tips  
i
4
Descript ion of t h e Hob  
3
1
3
2
EHG 6 7 2  
5
6
7
8
4
9
3
1
3
2
5
6
1. Hob Top  
2. Rapid Burner  
3. Semi-rapid Burners  
4. Auxiliary Burner  
7
4
8
EHG 6 7 4  
EHG 6 7 5  
9
5. Control knob for back right burner (semi-rapid)  
6. Control knob for back left burner (semi-rapid)  
7. Control knob for front left burner (rapid)  
8. Control knob for front right burner (auxiliary)  
9. Electric Ignition Push Button  
INSTALLATION  
WHEN THE HOB IS FIRST INSTALLED  
Any gas installation must be carried out by  
a registered CORGI installer, and in  
accordance with existing rules and  
regulations.  
Once the hob has been installed, it is  
important to remove any protective  
materials, which were put on in the factory.  
The relevant instructions are to be found in the  
second section of this manual.  
Please, ensure that, once the hob is  
installed, it is easily accessible for the  
engineer in the event of a breakdown.  
5
Operat ion  
HOB BURNERS  
To light a burner, turn the relevant control knob  
anticlockwise to maximum position. At the same time  
push the electric ignition button which is marked with  
a little spark.. Then adjust the flame as required.  
If the burner does not ignite, turn the control knob to  
zero, and try again.  
When switching on the mains, after  
installation or a power cut, it is quite normal  
for the spark generator to be activated  
automatically.  
i
To ensure maximum burner efficiency, you should  
only use pots and pans with a flat bottom fitting the  
size of the burner used (see table).  
Burner  
minimum maximum  
diameter  
diameter  
Large (rapid)  
Medium (semi-rapid) 120 mm.  
Small (Auxiliary) 80 mm.  
160 mm.  
240 mm.  
220 mm.  
160 mm.  
If you use a saucepan which is smaller than  
the recommended size, the flame will spread  
beyond the bottom of the vessel, causing the  
handle to overheat.  
As soon as a liquid starts boiling, turn down  
the flame so that it will barely keep the  
liquid simmering.  
i
Take care when frying food in hot oil or fat,  
as the overheated splashes could easily  
ignite.  
If the control knobs become difficult to turn,  
please contact your local Electrolux Service  
Centre.  
6
Main t en an ce an d Clean in g  
Before any maintenance or cleaning can be  
carried out, you must DISCONNECT the  
hob from the electricity supply.  
The hob is best cleaned whilst it is still warm, as  
spillage can be removed more easily than if it is left  
to cool.  
The Hob Top  
Regularly wipe over the hob top using a soft cloth  
well wrung out in warm water to which a little  
wasing up liquid has been added. Avoid the use of the  
following:  
- household detergent and bleaches;  
- impregnated pads unsuitable for non-stick saucepans;  
- steel wool pads;  
- bath/sink stain removers.  
Should the hob top become heavily soiled, it is  
recommended that a cleaning product such as Hob  
Brite or Bar Keepers Friend is used.  
Pan Supports  
The pan supports are dishwasher proof. If washing  
them by hand, take care when drying them as the  
enamelling process occasionally leaves rough edges.  
If necessay, remove stubborn stains using a paste  
cleaner.  
The Burners  
The burner caps and crowns can be removed for  
cleaning.  
Wash the burners taps and crowns using hot soapy  
water, and remove marks with a mild paste cleaner. A  
well moistened soap impregnated steel wool pad can  
be used with caution, if the marks are particularly  
difficult to remove.  
After cleaning, be sure to wipe dry with a soft cloth.  
7
Som et h in g Not Work in g?  
If the hob is not working correctly, please carry out the following checks before contacting your local  
Electrolux Service Force Centre.  
SYMPTOM  
SOLUTION  
There is no spark when lighting the gas  
Check that the unit is plugged in and the electrical  
supply is switched on  
Check that the RCCB has not tripped (if fitted)  
Check the mains fuse has not blown  
Check the burner cap and crown have been  
replaced correctly, e.g. after cleaning.  
The gas ring burns unevenly  
Check the main jet is not blocked and the burner  
crown is clear of food particles.  
Check the burner cap and crown have been  
replaced correctly, e.g. after cleaning.  
In-guarantee customers should ensure that the  
above checks have been made as the engineer will  
make a charge if the fault is not a mechanical or  
electrical breakdown.  
If after all these checks, your hob still does not  
operate correctly, contact your local Electrolux  
Service Force Centre.  
Please note that it will be necessary to provide proof  
of purchase for any in-guarantee service calls.  
Service an d Spare Part s  
If you require spare parts or an engineer contact your  
local Service Force Centre by telephoning:  
CUSTOMER CARE  
For general enquiries concerning your Electrolux  
appliance and for further information on Electrolux  
products, contact our Customer Care Department by  
letter or telephone as follows:  
0990-929929  
Your call will be routed to the Service Centre  
covering your post code area. The addresses of  
Electrolux Service Force Centres are detailed on the  
following pages.  
Customer Care Department  
Electrolux  
PO Box 47  
Newbury  
RG14 5XL  
Tel : 01635 52 27 99  
When you contact the Service Centre, they will need  
the following information:  
1. Your name, address and post code.  
2. Your telephone number  
3. Clear and concise details of the fault  
4. The model and the serial number (see rating label  
on the back of this instruction booklet)  
5. Date of purchase  
8
Gu aran t ee Con dit ion s  
* Appliances found to be in use within a  
ELECTROLUX STANDARD GUARANTEE  
CONDITIONS  
commercial or similar environment, plus those  
which are the subject to rental agreements.  
We, Electrolux, undertake that if, within 12 months  
of the date of the purchase, this Electrolux appliance  
or any part thereof is proved to be defective by any  
reason only of faulty workmanship or materials, we  
will, at our option, repair or replace the same FREE  
OF ANY CHARGE for labour, materials or carriage  
on condition that:  
* Products of Electrolux manufacture which are not  
marketed by Electrolux.  
Eu ropean Gu aran t ee  
If you should move to another country within Europe  
then your guarantee moves with you to your new  
home subject to the following qualifications:  
* The appliance has been correctly installed and  
used only on the gas and electricity supply stated  
on the rating plate.  
* The guarantee starts from the date you first  
purchased your product.  
* The appliance has been used for normal domestic  
purposes only, and in accordance with the  
manufacturer's instructions.  
* The guarantee is for the same period and to the  
same extent for labour and parts as exist in the  
new contry of use for this brand or range of  
products.  
* The appliance has not been serviced, maintained,  
repaired, taken apart or tampered with by any  
person not authorised by us.  
* This guarantee relates to you and cannot be  
transferred to another user.  
* All service work under this guarantee must be  
undertaken by a Electrolux Service Force Centre.  
* Your new home is within the European  
Community (EC) or European Free Trade Area.  
* Any appliance or defective part replaced shall  
become the Company's property.  
* The product is installed and used in accordance  
with our instructions and is only used  
domestically, i.e. a normal household  
* This guarantee is in addition to your statutory and  
other legal rights.  
The electrical supply complies with the  
specification given in the rating label.  
Home visits are made between 8.30am and 5.30pm  
Monday to Friday. Visits may be available outside  
these hours, in which case a premium will be  
charged.  
* The product is installed taking into account  
regulations in your new country.  
Before you move, please contact your nearest  
Customer Care centre, listed below, to give them  
details of your new home. They will then ensure that  
the local Service Organisation is aware of your move  
and able to look after you and your appliances.  
Exclu sion s  
This guarantee does not cover:  
* Damage or calls resulting from transportation,  
improper use or neglect, the replacement of any  
light bulbs or removable parts of glass or plastic.  
France  
Senlis  
+33 (0)3 44 62 22 22  
Germany Nürnberg +49 (0)911 323 2600  
Italy  
Sweden  
UK  
Pordenone +39 (0)1678 47053  
Stockholm +46 (0)20 78 77 50  
Newbury +44 (0)1635 522 799  
* Costs incurred for calls to put right an appliance  
which is improperly installed or calls to appliance  
outside the United Kingdom.  
9
ELECTRO LUX SERVICE FO RCE  
To con t act you r local Elect rolu x Service Force Cen t re t eleph on e 0 9 9 0 9 2 9 9 2 9  
ISLE OF LEWIS  
(M69)  
ND Macleod  
16 James Street  
Stornoway  
Isle of Lewis  
PA872QW  
NORTH EAST  
CHANNEL ISLANDS  
GUERNSEY  
Guernsey Electricity  
PO Box 4  
GATESHEAD  
Unit 356a  
Dukesway Court  
Dukesway  
(M39)  
Vale , Guernsey  
Channel Islands  
Team Valley  
Gateshead  
NE11 0BH  
KELSO  
(M08)  
2-8 Wood Market  
Kelso  
Borders TD5 7AX  
JERSEY  
Jersey Electricity  
Company  
PO Box 45  
Queens Road  
St Helier  
Jersey  
Channel Islands  
JE4 8NY  
GRIMSBY  
(M42)  
Unit 2  
Cromwell Road  
Grimsby  
South Humberside  
DN31 2BN  
ORKNEY  
(M65)  
Corsie Domestics  
7 King Street  
Kirkwall  
Orkney KW15 1RE  
SHETLAND  
Tait Electronic Systems  
Ltd.  
Holmsgarth Road  
Lerwick  
HULL  
(M41)  
Unit 1  
Boulevard Industrial  
Estate  
Hull  
(OWN SALES)  
SHETLAND  
Shetland ZE1 0PW  
HU3 4AY  
SCOTLAND  
Bolts Shetland Ltd  
26 North Road  
Lerwick  
LEEDS  
(M37)  
64-66 Cross Gates Road  
Leeds  
LS15 7NN  
ABERDEEN  
(M05)  
8 Cornhill Arcade  
Cornhill Drive  
Aberdeen  
(OWN SALES)  
WHALSAY  
Shetland ZE1 0PE  
AB2 5UT  
NEWTON AYCLIFFE Unit 16  
(M45)  
Leask Electrical  
Harlsdale  
Symbister, Whalsay  
Shetland ZE2 9AA  
Gurney Way  
AUCHTERMUCHY 33A Burnside  
Aycliffe Ind Estate  
Newton Aycliffe  
DL5 6UJ  
(M03)  
Auchtermuchy  
Fife  
KY14 7AJ  
(OWN SALES)  
SHEFFIELD  
(M38)  
Pennine House  
Roman Ridge Ind.  
Roman Ridge Road  
Sheffield  
BLANTYRE  
(M07)  
Unit 5  
Block 2  
Auchenraith Industrial  
Estate  
Rosendale Way  
Blantyre  
S9 1GB  
NORTHERN IRELAND  
G72 0NJ  
BELFAST  
(M27)  
Owenmore House  
Kilwee Industrial Estate  
Upper Dunmury Lane  
Belfast  
NORTH WEST  
DUMFRIES  
(M01)  
93 Irish Street  
Dumfries  
Scotland  
BIRKENHEAD  
(M11)  
1 Kelvin Park  
Dock Road  
Birkenhead  
L41 1LT  
BT17 0HD  
DG1 2PQ  
DUNOON  
(M 67)  
Briar Hill  
7 Hill Street  
Dunoon  
Argyll  
PA23 7AL  
WALES  
CARLISLE  
(M10)  
Unit 8  
South John Street  
Carlisle  
CARDIFF  
(M28)  
Guardian Industrial  
Estate  
Clydesmuir Road  
Tremorfa, Cardiff  
CF2 2QS  
CA2 5AJ  
GLASGOW  
(M04)  
20 Cunningham Road  
Clyde Estate  
Rutherglen,  
Glasgow,  
G73 1PP  
ISLE OF MAN  
(M64)  
South Quay Ind Estate  
Douglas  
Isle of Man  
CLYWD  
(M14)  
Unit 6-7 Coed - Parc  
Abergele Road  
Rhuddlan  
Clwyd  
Wales  
LIVERPOOL  
(M15)  
Unit 1  
INVERNESS  
(M06)  
Unit 3B  
Smithton Indust. Est.  
Smithton  
Inverness  
IV1 2PD  
Honeys Green Precinct  
Honeys Green Lane  
Liverpool  
L12 9JH  
LL18 5UG  
MANCHESTER  
(M09)  
Unit 30  
Oakhill Trading  
Estate  
Devonshire Road  
Worsley  
Manchester  
M28 3PT  
OSWESTRY  
(M17)  
Plas Funnon Warehouse  
Middleton Road  
Oswestry  
ISLE OF ARRAN  
Arran Domestics  
Unit 4 The Douglas  
Centre  
SY11 2PP  
Brodick  
Isle of Arran  
KA27 8AJ  
HAVERFORDWEST Cromlech Lodge  
(M75)  
(OWN SALES)  
Amerlston  
Haverfordwest  
SA62 5DS  
ISLE OF BARRA  
J Zerfah  
PRESTON  
(M13)  
Unit 250  
244 Bruernish  
Isle of Barra  
Western Islands  
HS9 5QY  
Dawson Place  
Walton Summit  
Bamber Bridge  
Preston  
(OWN SALES)  
Lancashire  
PR5 8AL  
ISLE OF BUTE  
(M66)  
Walker Engineering  
Glenmhor  
Upper Serpentine Road  
Rothesay  
STOCKPORT  
(M16)  
Unit 20 Haigh Park  
Haigh Avenue  
Stockport  
Isle of Bute  
PA20 9EH  
SK4 1QR  
10  
ELECTRO LUX SERVICE FO RCE  
To con t act you r local Elect rolu x Service Force Cen t re t eleph on e 0 9 9 0 9 2 9 9 2 9  
MIDLANDS  
LONDON & EAST ANGLIA  
SOUTH EAST  
BIRMINGHAM  
(M18)  
66 Birch Road East,  
Wyrley Road Industrial  
Estate  
Witton  
Birmingham  
B67DB  
CANVEY ISLAND  
2-4 Sandhurst  
Kings Road  
Canvey Island  
SS8 0QY  
ASHFORD  
(M58)  
Unit 2  
Bridge Road Business  
Estate  
Bridge Road  
Ashford  
Kent  
CHELMSFORD  
(M47)  
Hanbury Road  
Widford Ind Estate  
Chelmsford  
Essex  
TN2 1BB  
BOURNE  
(M44)  
Manning Road Ind  
Estate  
Pinfold Road  
Bourne  
PE10 9HT  
FLEET  
(M59)  
Unit 1  
Redfields Industrial  
Estate  
Church Crookham  
Fleet  
Hampshire  
GU13 0RD  
CM12 3AE  
COLINDALE  
(M53)  
Unit 14  
Capital Park  
Capital Way  
Colindale  
BRIDGNORTH  
(M72)  
1 Underhill Street  
Bridgnorth  
Salop  
London NW9 0EQ  
WV16 4BB  
HAYWARDS HEATH 21-25 Bridge Road  
(M55)  
ENFIELD  
(M49)  
284 Alma Road  
Enfield  
London  
Haywards Heath  
Sussex  
RH16 1UA  
GLOUCESTER  
(M23)  
101 Rycroft Street  
Gloucester  
GL1 4NB  
EN3 7BB  
TONBRIDGE  
(M56)  
Unit 30 Deacon Trading  
Estate  
Morley Road  
Tonbridge  
Kent  
TN9 1RA  
HEREFORD  
(M31)  
Unit 3  
GRAVESEND  
(M57)  
Unit B4,  
Imperial Business Estate  
Gravesend  
Kent  
DA11 0DL  
Bank Buildings  
Cattle Market  
Hereford  
HE4 9HX  
HIGHAM FERRERS The Old Barn  
HARPENDEN  
(M46)  
Unit 4  
(M51)  
Westfield Terrace  
Higham Ferrers  
NN10 8BB  
Riverside Estate  
Coldharbour Lane  
Harpenden  
SOUTH WEST  
AL5 4UN  
BARNSTAPLE  
(M30)  
P.O. Box 12  
Barnstaple  
North Devon  
EX31 2YB  
ILKESTON  
(M43)  
Unit 2  
Furnace Road  
Ilkeston  
LETCHWORTH  
(M50)  
16-17 Woodsite Ind Est.  
Works Road  
Letchworth  
Herts  
SG6 1LA  
DE7 5EP  
BOURNEMOUTH  
(M26)  
63-65 Curzon Road  
Bournemouth  
Dorset  
LEICESTER  
(M22)  
Unit 7  
Oaks Industrial Estate  
Coventry Road  
Narborough  
Leicestershire  
LE0 5GF  
LETCHWORTH  
(M50)  
16-17 Woodsite Ind Est.  
Works Road  
Letchworth  
BH1 4PW  
BRIDGEWATER  
(M35)  
6 Hamp Industrial Estate  
Bridgewater  
Somerset  
Herts  
SG6 1LA  
LINCOLN  
(M40)  
Unit 8 Stonefield Park  
Clifton Street  
Lincoln  
LONDON  
(M76)  
2/4 Royal Lane  
Yiewsley  
West Drayton  
Middlesex  
BRISTOL  
(M25)  
11 Eldon Way  
Eldonwall Trading  
Bristol  
Avon  
BS4 3QQ  
LN5 8AA  
NEWCASTLE  
UNDER LYME  
(M12)  
18-21 Croft Road  
Brampton Industrial  
Estate  
Newcastle under Lyme  
Staffordshire  
UB7 8DL  
MOLESEY  
(M61)  
10 Island Farm Avenue  
West Molesey  
Surrey  
EMSWORTH  
(M33)  
266 Main Road  
Southboure  
Emsworth  
ST5 0TW  
KT8 2UZ  
PO10 8JL  
NUNEATON  
(M21)  
19 Ptarmigan Place  
Townsend Drive  
Nuneaton  
NEWBURY  
(M24)  
PO BOX 5672  
Newbury  
ISLE OF WIGHT  
(M34)  
Unit 8  
Enterprise Court  
Ryde Business Park  
Ryde  
Berkshire  
CV11 6RX  
RG14 5GF  
Isle of Wight  
PO33 1DB  
IPSWICH  
(M48)  
Unit 2B  
Elton Park Business  
Centre  
Hadleigh Road  
Ipswich  
IP2 0DD  
REDDITCH  
(M20)  
Heming Road  
Washford  
Redditch  
Worcestershire  
B98 0DH  
NEWTON ABBOT  
(M29)  
Unit 2  
Zealley Industrial Estate  
Kingsteignton  
Newton Abbot  
S. Devon  
TAMWORTH  
(M19)  
Unit 3  
NORWICH  
(M52)  
2b Trafalgar Street  
Norwich  
NR1 3HN  
TQ12 3TD  
Sterling Park  
Claymore  
Tamworth  
B77 5DO  
PLYMOUTH  
(M32)  
16 Faraday Mill  
Cattledown  
Plymouth  
SUNBURY  
(M63)  
Unit 1a  
The Summit  
Hanworth Road  
Hanworth Ind Estate  
Sunbury on Thames  
TW16 5D  
PL4 0ST  
WORCESTER  
(M73)  
Unit 1  
Northbrook Close  
Gregorys Mill Ind Estate  
Worcester  
REDRUTH  
(M36)  
Unit 7D Pool Industrial  
Estate  
Wilson Way, Redruth,  
Cornwall  
TR15 3QW  
WR3 8BP  
SYDENHAM  
(M62)  
Unit 6  
Metro Centre  
Kangley Bridge Road  
Sydenham  
SE26  
11  
In st ru ct ion s for t h e In st aller  
Engineer technical data  
OVERALL DIMENSIONS  
SUPPLY CONNECTIONS  
Width:  
Depth:  
Height:  
Weight:  
580 mm.  
500 mm.  
88 mm.  
8 Kg.  
Gas:  
RC 1/2 inch (1/2 inch male) Rear right hand corner  
Electric:  
230-240V 50Hz supply, 3 core flexible cable with  
non rewireable plug fitted with a 3 amp cartridge  
fuse.  
CUT OUT DIMENSIONS  
Width:  
Depth:  
550 mm.  
470 mm.  
This appliance complies with the EEC Directive No  
89/336, concerning suppression of radio electrical  
interference.  
Thickness: 30 mm.  
Ign it ion HT Spark  
Spark Generator  
Spark Gap  
Ispra Control's BF 50046 - 230-240V 0.6 YA T 120  
Fixed  
Rear Left Burner (semi rapid)  
Rear Right Burner (semi rapid)  
Heat Input  
2.0 kW (6824 BTU/HR)  
Heat Input  
2.0 kW (6824 BTU/HR)  
Front Left Burner (rapid)  
Front Right Burner (auxiliary)  
Heat Input  
3.0 kW Natural Gas (10236 BTU/HR)  
2.8 kW L.P.G. (9554 BTU/HR)  
Heat Input  
1.0 kW (3412 BTU/HR)  
BURNER  
RAPID  
(large)  
SEMI-RAPID  
(medium)  
AUXILIARY  
(small)  
POSITION  
MAX  
MIN  
MAX  
MIN  
MAX  
MIN  
NOMINAL THERMAL  
POWER  
kW  
3.0  
0.65  
2.0  
0.45  
1.0  
0.33  
NOMINAL FLOW  
RATE  
m3/h  
0.286  
119  
0.057  
0.190  
96  
0.038  
0.095  
70  
0.028  
NOZZLE REFERENCE  
1/100 mm  
Adjust.  
Adjust.  
Adjust.  
NOMINAL THERMAL  
POWER  
kW  
2.8  
0.65  
2.0  
0.45  
1.0  
0.33  
NOMINAL FLOW  
RATE  
g/h  
202  
86  
43.5  
40  
144  
71  
29  
32  
72  
50  
21,5  
28  
NOZZLE REFERENCE  
1/100 mm  
CLASS APPLIANCE: 3  
Burner  
Dia. Tap By-pass  
1/100 mm  
Tap colour  
APPLIANCE  
Auxiliary  
Semi-rapid  
Rapid  
28  
32  
40  
Yellow/Red  
Green/Black  
Violet/Black  
CATEGORY: II2H3+  
APPLIANCE  
GAS SUPPLY: Natural gas G20 / 20mbar  
Aeration adjustment none  
12  
Im port an t safet y requ irem en t s  
This hob must be installed in accordance with the Gas  
Safety (Installation and Use) Regulations (Current  
Edition) and the IEE Wiring Regulations (Current  
Location  
Edition).  
The hob may be located in a kitchen, a kitchen/diner  
or bed sitting room, but not in a bathroom or shower  
room.  
Before making the cut out in the worktop ensure that  
there is a minimum distance of 55 mm. between the  
rear edge of the hob and the wall.  
A minimum distance of 100 mm. must be left  
between the side edges of the hob and any adjacent  
cabinets or walls.  
The minimum distance combustible material can be  
fitted above the hob in line with the edges of the hob  
is 420 mm. If it is fitted below 420 mm. a space of 50  
mm. must be allowed from the edges of the hob.  
The minimum distance combustible material can be  
fitted directly above the hob is 700 mm.  
Detailed recommendations are contained in the  
following British Standards Codes Of Practice: B.S.  
6172/ B.S. 5440, Par. 2 and B.S. 6891 Current  
Editions.  
The hob should not be installed in a bed sitting room  
with a volume of less than 20 m3. If it is installed in a  
room of volume less than 5 m3 an air vent of effective  
area of 110 cm2 is required. If it is installed in a room  
of volume between 5 m3 and 10 m3 an air vent of  
effective area of 50 cm2 is required, while if the  
volume exceeds 11 m3 no air is required.  
However, if the room has a door which opens directly  
to the outside no air vent is required even if the  
volume is between 5 m3 and 11 m3.  
If there are other fuel burning appliances in the same  
room, B.S. 5440 Part 2 Current Edition, should be  
consulted to determine the requisite air vent  
requirements.  
INSTALLATION GUIDANCE INSTRUCTIONS  
CLEARANCES REQUIRED  
INSTALLATION GUIDANCE INSTRUCTIONS  
CLEARANCES REQUIRED  
WHEN FITTING THE GAS HOB  
WITHOUT A COOKER HOOD ABOVE  
WHEN FITTING THE GAS HOB  
WITH A COOKER HOOD ABOVE  
700 mm  
7
0
0
mm  
420 mm  
420 mm  
55 mm  
55 mm  
420 mm  
420 mm  
100 mm  
100 mm  
50 mm  
50 mm  
FO 0812  
FO 0813  
13  
In st allat ion  
IMPORTANT  
This hob must be installed by qualified  
personnel to the relevant British Standards.  
Any gas installation must be carried out by  
a registered CORGI installer.  
The manufacturer will not accept liability,  
should the above instructions or any of the  
other safety instructions incorporated in  
this book be ignored.  
On the end of the shaft, which includes the GJ 1/2"  
threaded elbow, adjustment is fixed so that the washer  
is fitted between the components as shown in the  
diagram. Screw the parts together without using  
excessive force.  
Gas Connection  
Connection to the gas supply should be with either  
rigid or semi-rigid pipe, i.e. steel or copper.  
The connection should be suitable for connecting to  
RC 1/2 (1/2 BSP male thread).  
When the final connection has been made, it is  
essential that a thorough leak test is carried out on the  
hob and installation.  
FO 0264  
A) End of shaft with nut  
B) Washer  
C) Elbow  
Ensure that the main connection pipe does not exert  
any strain on the hob.  
It is important to install the elbow correctly,  
with the shoulder on the end of the thread,  
fitted to the hob connecting pipe.  
Rect an gu lar cu t -ou t size for h ob  
Failure to ensure the correct assembly will  
cause leakage of gas.  
580  
500  
Cut O ut Size  
The dimensions of the cut-out are given in the  
diagram.  
550  
470  
55 min.  
FO 2109  
14  
Bu ildin g In  
Building over a cupboard or drawer  
If the hob is to be installed above a cupboard or  
drawer it will be necessary to fit a heat resistant board  
below the base of the hob on the underside of the  
work surface.  
It is also recommended to carry out the electrical  
connection to the hob as shown in diagrams 1 and 2.  
ON/OFF SWITCH  
ON/OFF SWITCH  
2
1
3
a
60  
FLEX  
OUTLET  
b
FLEX  
OUTLET  
FO 0764  
FO 1013  
FO 0763  
Dimensions are given in mm.  
Building over a kitchen unit with door  
Proper arrangements must be taken in designing the  
furniture unit, in order to avoid any contact with the  
bottom of the hob which can be heated when it is  
operated. The recommended solution is shown in  
diagram 3.  
The panel fitted under the hob ("a") should be easily  
removable to allow easy access if technical assistance  
is needed. The space behind the kitchen unit ("b") can  
be used for connections.  
Fitting the hob to the worktop  
Before fitting the hob into the cut out, an adhesive  
sealing gasket supplied with the hob must be fitted to  
the edge of the cut out. It is essential that no gaps are  
left in this seal in order to prevent spillage near the  
hob seeping into the cabinet below.  
1) Place the sealing gasket all around the edge  
of the cut out.  
2) Place the hob into the cut out and secure it by  
means of the relevant fixing clamps and  
screws, as shown in the diagram.  
FO 0402  
a) Sealing gasket  
15  
Elect rical con n ect ion s  
Permanent Connection  
Any electrical work required to install this  
hob should be carried out by a qualified  
electrician or competent person, in  
In the case of a permanent connection, it is necessary  
that you install a double pole switch between the hob  
and the electricity supply (mains), with a minimum  
gap of 3 mm. between the switch contacts and of a  
type suitable for the required load in compliance with  
the current electric regulations.  
accordance with the current regulations.  
THIS HOB MUST BE EARTHED.  
The switch must not break the yellow and green earth  
cable at any point.  
Th e m an u fact u rer declin es an y liabilit y  
sh ou ld t h ese safet y m easu res n ot be  
observed.  
Ensure that the hob supply cord does not  
come into contact with surfaces with  
temperatures higher than 50 deg. C.  
Th is h ob is design ed t o be con n ect ed t o a  
2 3 0 -2 4 0 V 5 0 Hz AC elect rical su pply.  
Before switching on, make sure the electricity supply  
voltage is the same as that indicated on the hob rating  
plate. The rating plate is located on the bottom of the  
hob. A copy is attached on the back cover of this  
book.  
The hob is supplied with a 3 core flexible supply cord  
incorporating a 3amp plug fitted. In the event of  
having to change the fuse, a 3amp ASTA approved  
(BS 1362) fuse must be used.  
Should the plug need to be replaced for any reason,  
the wires in the mains lead are coloured in  
accordance with the following code:  
Green and Yellow - Earth  
Blue  
Brown  
- Neutral  
- Live  
— Connect the green and yellow (earth) wire to  
the terminal in the plug which is marked with  
the letter 'E' or the earth symbol  
coloured green and yellow.  
or  
— Connect the blue (neutral) wire to the terminal  
in the plug which is marked with the letter 'N'  
or coloured black.  
— Connect the brown (live) wire to the terminal  
in the plug which is marked with the letter 'L'  
or coloured red.  
Upon completion there must be no cut, or stray  
strands of wire present and the cord clamp must be  
secure over the outer sheath.  
FO 0390  
A cut off plug inserted into a 13 amp  
socket is a serious safety (shock) hazard.  
Ensure that the cut off plug is disposed of  
safely.  
16  
Wirin g diagram  
L
1
2
3
4
A
0
220/240  
B
N
A. IGNITOR SWITCH  
B. IGNITOR UNIT  
17  
Fau lt Fin din g  
Prelim inary Electrical System s Check  
PLUG (with cover removed)  
SOCKET  
(face view)  
Earth Wire  
Green/Yellow  
( )  
( )  
E
Blue  
Brown  
Green  
Yellow  
START  
Neutral Wire  
Blue  
Isolate appliance  
and carry out:  
A: Earth Continuity  
check.  
N
L
Blue  
Green  
Yellow  
Brown  
Carry out:  
D: Resistance to  
Earth check.  
Electricity supply  
should now be  
satisfactory.  
NO  
YES  
Carry out:  
C: Polarity check.  
A. EARTH CONTINUITY CHECK -  
Appliance must be electrically  
Has inlet fuse blown?  
disconnected - meter set on (Ohms) x 1  
scale and adjust zero if necessary.  
YES  
NO  
a) Test leads from any appliance earth point  
to earth pin on plug. Resistance should  
be less than 0.1 (Ohm), check all earth  
wires for continuity and all contacts clean  
and tight.  
Inlet wiring  
faulty.  
Rectify any  
fault.  
B. INSULATION CHECK - Appliance  
electrically disconnected, all switches ON.  
a) meter set on (Ohms) x 1 scale.  
Test leads from L to N in appliance  
terminal block. If meter reads «0» then  
there is a short circuit.  
Isolate appliance and  
carry out:  
B: Insulation check.  
Rectify any fault  
including replacing  
fuses as necessary.  
b) meter set on (Ohm) x 100 scale.  
Repeat test with leads from L to E. If meter  
reads less than (infinity) there is a fault.  
NOTE - Should it be found that the fuse  
has failed but no fault is indicated - a  
detailed continuity check (i.e. by  
disconnecting and checking each  
component) is required to trace the faulty  
component.  
It is possible that a fault could occur as a  
result of local burning/arcing but no fault  
could be found under test. However a  
detailed visual inspection should reveal  
evidence of burning around the fault.  
18  
Ignition System / Gas Ignition  
YES  
Check gas supply at  
burner  
Ignitor does not spark  
NO  
Check plug top fuse and  
replace if necessary  
Light burner manually  
Check by pass simmer  
adjusted  
Check polarity and earth  
continuity of supply point  
Check position of the  
electrode  
Check earth continuity  
of appliance  
Check fitting of burners  
Check continuity from the tip of  
each electrode to the terminals 1  
to 4 on the ignitor unit  
Check continuity from 'N' on the  
mains connector block and "O" on  
the ignitor unit  
Check continuity from 'L' on the  
mains connector block and the  
taps ignition switches  
Check for breaks in the insulation  
of the HT leads  
Check continuity from ignition  
switches connector to ignitor unit  
Change the ignitor unit  
19  
Com m ission in g  
When the hob has been fully installed it will be  
necessary to check the minimum flame setting. To do  
this, follow the procedure below.  
- Turn the gas tap to the MAX position and ignite.  
- Set the gas tap to the MIN flame position then turn  
the control knob from MIN to MAX several times.  
If the flame is unstable or is extinguished follow the  
procedure below.  
Procedure:  
Re-ignite the burner and set to MIN.  
Remove the control knob.  
FO 1032  
a) Minimum adjustment screw  
b) Tap  
You can find two different adjustment screw  
locations according to the gas tap (sse  
diagram). The "b" type has the adjustment  
screw located down the centre of th egas tap  
control shaft. The "c" type has the by pass  
screw located to the side of the gas tap  
itself.  
To adjust, use a thin bladed screwdriver and  
turn the adjustment screw until the flame is  
steady and does not extinguish, when the  
knob is turned from MIN to MAX. Repeat  
this procedure for all burners.  
Pressu re Test in g  
Remove left hand pan support and front left  
burner cap and crown.  
Fit manometer tube over the injector.  
Turn on the burner gas supply and ignite  
another burner supply.  
The pressure reading should be nominally  
20mbar and must be between 17 mbar and  
25mbar.  
Turn off the burner supplies.  
20  
Servicin g  
A: Rem oval Of Hob Top  
D: Rem oval Of Bu rn er  
1. Remove all control knobs, pan supports, burner caps  
and crowns.  
2. Remove 2 screws from each burner.  
3. Lift the hob top at the rear and disengage it from the  
front locators.  
1. Follow the procedures in Section A.  
2. With the aid of a 12mm spanner loosen off the pipe  
connection nut.  
3. From the underside of the hob remove 2 self tapping  
screws from the burner body.  
4. Remove fixing nut from generator and earth lead to  
hob.  
4. Reassemble in reverse order and carry out leak test.  
5. Reassemble in reverse order ensuring leads are not  
trapped below the hob top (rewire as wiring  
diagram).  
E: Rem oval Of Ign it or Un it  
(Isolat e Elect ric Su pply)  
B: Rem oval Of t h e Hob Taps  
(Isolat e Elect ric Su pply)  
1. Follow the procedures in Section A.  
2. Disconnect H.T. leads and the ignition switches  
connector.  
3. Remove the Ignitor Pushbutton  
4. Unscrew the fixing nut.  
5. Remove the protective gasket.  
6. Remove the Ignitor Unit  
7. Reassemble in reverse order and check with wiring  
diagram for correct reconnection.  
1. Follow the procedures in Section A.  
2. With the aid of a 7mm spanner remove the clamping  
bolt from the fixing clamp.  
3. Loosen the pipe connection nut from the gas tap with  
the aid of a 16mm spanner. Remove fixing clamps.  
4. Reassemble in reverse order and carry out leak test.  
C: Rem oval Of Main s Term in al Block  
(Isolat e Elect ric Su pply)  
Repais m ay on ly be carried ou t by  
CORGI regist ered en gin eers.  
1. Follow the procedures in Section A.  
2. Disconnect supply flex connections from terminal  
block.  
3. From the underside of the hob remove 1 self tapping  
screw from the terminal block.  
4. Reassemble in reverse order.  
Con version from Nat u ral Gas t o LPG  
It is important to note that this model is designed for  
use with natural gas but can be converted for use with  
butane or propane gas providing the correct injectors  
are fitted. The gas rate is adjusted to suit.  
TO ADJ UST THE GAS RATE  
With the aid of a thin bladed screwdriver completely  
tighten down the by pass adjustment screw, which is  
located down the centre of the gas tap control shaft.  
Upon completion stick the replacement rating plate  
on the under side of the hob.  
Met h od  
• Ensure that the gas taps are in the 'OFF' position  
• Isolate the hob from the electricity supply  
• Remove all pan supports, burner caps, rings, crowns  
and control knobs.  
• With the aid of a 7mm box spanner the burner  
injectors can then be unscrewed and replaced by the  
appropriate LPG injectors.  
IMPORTANT  
The replacement/conversion of the gas hob should  
only be undertaken by a competent person  
21  

Gigabyte 7VT600 RZ C User Manual
Epson V4 22 User Manual
Dell Computer Monitor S2209W User Manual
Dell Alienware OptX AW2310 User Manual
Cypress CY7C2565KV18 User Manual
Asus Terminator 2 Barebone System T2 P User Manual
Asus LCD Monitor 90LMGE001T0223UL User Manual
Apple 20Display User Manual
Advantech INTEL AIMB 210 User Manual
Acer AL 718 User Manual